Central govt okays construction of tunnel, railway line projects to Tawang

It has also approved operation of Pasighat Airport, and setting up Hollongi Airport

Tunnel, Sela Pass, Tawang, Arunachal Pradesh, Pasighat Airport, Hollongi Airport, Itanagar, Bhalukpong Tenga Tawang, North Lakhimpur Bame Aalo Silapathar, Pasighat Tezu Parsuram  Kund Rupai, North East  Industrial  Corridor

The Central government has approved construction of a tunnel at Sela Pass to Tawang in Arunachal Pradesh and over 800 km railway lines to three strategic locations of the state.

The Centre has also approved operation of Pasighat Airport, and setting up Hollongi Airport near Itanagar. The three strategic railway projects include the proposed Bhalukpong-Tenga-Tawang (378 km), North Lakhimpur-Bame-Aalo-Silapathar (247.85 km) and Pasighat-Tezu-Parsuram Kund-Rupai (227 km). These lines are expected to improve connectivity to northern and eastern frontiers of the state.

The projects will provide all-weather connectivity to local population, facilitate movement of the Armed Forces and give a boost to tourism. The Central government is also planning to set up North-East Industrial Corridor (NEIC) that will create numerous job opportunities for people of the region.

The Industrial Corridor will act as a land bridge between India and South- East Asia that will provide employment opportunities and give a fillip to trade and tourism.

Most Popular

Awards

Olympia Group announces to build up 1.1mn sq-ft greenfield it park in Guindy
The project will have a total investment of about Rs 750 crore

Conferences

Vital pre-monsoon building works resume in Maharashtra
The state government has permitted pre-monsoon work by BMC and other agencies

Latest Issue

Sept 2020
01 Sep 2020