Built to inform

Sign up for the daily newsletters

No, Thank you

NTPC’s installed capacity touches 55,126MW

Crosses 55,000MW mark with commissioning of 1st unit of 800MW of Gadarwara Super Thermal power project

NTPC, Gadarwara Super Thermal Power Project, Madhya Pradesh, Power generation, Coal, Gas, Thermal, Wind energy

India’s largest power generator NTPC announced the increase of its total installed capacity to 55,126 MW with the commissioning of 1st Unit of 800MW of Gadarwara Super Thermal Power Project (2x800MW). The Gadarwara Supercritical coal based power project is located in Madhya Pradesh.

With a vision to be the world’s leading power company, energising India’s growth, the Maharatna addresses the power needs of a vast majority of population with high level of efficiency. 

NTPC group, including its joint ventures and subsidiaries, currently operates 52 stations based on coal, gas/liquid fuel, solar, hydro and wind energy. NTPC aims to achieve total installed capacity of 130GW by 2032.

Most Popular

Multimedia

Awards

Olympia Group announces to build up 1.1mn sq-ft greenfield it park in Guindy
The project will have a total investment of about Rs 750 crore

Latest Issue

June 2019
06 Jun 2019