USHA SHRIRAM expands footprints in solar power with Eurolex smart on-grid inverters

Is ready to disrupt the solar power market with “Eurolex Smart On-Grid Inverters” studded with Bluetooth Mobile App

Solar power segment, USHA SHRIRAM, Smart on-grid inverters, Eurolex, Bluetooth connectivity, Satnam Sandhu, Roof top solar power plants

Expanding its extensive product portfolio in solar power segment, USHA SHRIRAM has unveiled a unique range of smart on-grid inverters under its most desirable brand ‘Eurolex’. Ready to disrupt the market, the most exciting “Eurolex Smart On-Grid Inverters” launched by USHA SHRIRAM boasts advanced features such as Bluetooth connectivity and easy to install features.

Aesthetically designed inverters are available in varied range from 2KVA-200KVA to suit different installations and applications. Moreover the state-of-the-art product range comes with warranty extendable upto 25 years. Eurolex Smart On-Grid Inverters offer higher efficiency and output to its valued customers while their Bluetooth mobile app makes their monitoring easy and free.  

Satnam Sandhu, executive director, USHA SHRIRAM, said, “We are engaged in augmenting solar power technologies under ‘Eurolex’. Apart from launching a wide range of solar power products we are also installing varied range of on-grid and off-grid roof top solar power plants across the country with the support of our EPC players. Through these efforts we aim to facilitate the mass use of solar energy to support the government’s vision to enhance the country’s renewable energy capacity.”

Major USPs of Eurolex Smart On-Grid Inverters: Maintenance free and easy to install and use, online and onsite support, inbuilt SPDs on AC and DC side, varied range 2KVA-200KVA, DC overloading of 35% is permissible, Ultramodern design with aluminium heat exchangers, and warranty extendable up to 25 years.
The inverters are priced between Rs 35,000-2,50,000 from 3KVA to 50KVA.

Most Popular

Awards

Olympia Group announces to build up 1.1mn sq-ft greenfield it park in Guindy
The project will have a total investment of about Rs 750 crore

Conferences

Vital pre-monsoon building works resume in Maharashtra
The state government has permitted pre-monsoon work by BMC and other agencies

Latest Issue

Sept 2020
01 Sep 2020