Middle East Construction News – Construction Week Online

Home / NEWS / MEP / Rural electrification drive likely to miss target


Rural electrification drive likely to miss target

by CW India Staff on Jun 1, 2009


  Be the first to comment
RSS Feeds Print this page

The five-year Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) launched in April 2005 to electrify 1.25 lakh villages and about 2.34 lakh BPL families looks set to miss its targets with less than 50% of the selected villages being electrified thus far as per official estimates.
The RGGVY scheme will need to electrify more than 63,000 villages in about a year to meet its target before its scheduled closure on March 31, 2010. According to informed sources, with 2009-10 being its last year, there was a need for speedy implementation if the programme was to achieve its set targets on schedule.
Though it is unlikely that the target of 2.34 lakh BPL households would be met given the shortage of time, it was possible to meet the power needs of the remainder of the selected villages, the source added. The Ministry of Power has already sought a minimum budgetary support of Rs9,000 crore to meet the implementation costs of this programme for 2009-10.

 

Advertisement

COMMENT


Comment on this article



COMMENTS

Name *
Email *
City
Country
Subject: *
Comments: *
Math Question: *
Solve this simple math problem
and enter the result. E.g. for 1+3, enter 4.
Refresh the image if not clear
Remember me on this computer



NEWSLETTER SUBSCRIPTION
Email:

SUBSCRIBE TO MAGAZINES

Architect - India
Architect - India
Hotelier India
Digital Production India
Construction Week Online - Middle East
Arabian Supply Chain Middle East
Hotelier Middle East
Digital Production Middle East
Arabian Oil and Gas Middle East
Utilities middle east
CONCRETE CALCULATOR
Thickness inches
Width feet
Length feet
Cubic Yards:
How many Pre-Mix Ready Mix Bags:
40# Bags:
60# Bags:
80# Bags:
Depth inches
Width inches
Length feet
Cubic Yards:
How many Pre-Mix Ready Mix Bags:
40# Bags:
60# Bags:
80# Bags:
Diameter inches
Height inches
Cubic Yards:
How many Pre-Mix Ready Mix Bags:
40# Bags:
60# Bags:
80# Bags:
Articles
ITP.com
Ahlan.ae Masala.ae Ahlanlive.com ArabianBusiness.com ArabianBusiness.com/Arabic ArabianBusiness.com/Jobs ArabianBusiness.com/Property ArabianOilandGas.com ArabianSupplyChain.com ArabianTravelDirectory.com ConstructionWeekOnline.com ConstructionWeekOnline.com DigitalProductionME.com Grazia.ae HotelierMiddleEast.com ITP.net TimeOutAbuDhabi.com TimeOutDubai.com TimeOutTickets.com Utilities-ME.com VivaMagazine.ae commsmea.com designmena.com